Camp Ladore

Camp Ladore engaged the services of Aquattica Pools and Water Parks for the renovation of pools at two separate sites on their campus.


Project Features
  • Marcite finish
  • Slide
  • Toy features
  • Energy-efficient enclosure



Aquattica created plans for the renovation of an outdoor, z-shaped pool. The renovations included changing the profile of the pool to make it less deep, as well as removal of the diving boards, removal of an old slide, and installation of a new slide.  The renovations also included patching and remarciting the new facility, and renovating the balance tank located on the deck.

The team at Aquattica assessed the equipment room, and put in all new filtration equipment and chemical control systems.

The team added toy features to the “kiddie” pool to make it more useful and attractive to swimmers. 

The second project at Camp Ladore called for the renovation of a small outdoor pool that was located adjacent to the lodge.  The team at Aquattica completely renovated the pool and spa with new tile.  They added all new filtration equipment to ensure Department of Health code-compliancy.

Structures Unlimited, a Manchester, NH-based company, constructed a light-filled, energy-efficient building that enclosed the pool to make it available for year-round use.


Project Location

398 South Street
Waymart, PA 18472

Google Map