•  
  •  
  •  
  •  
 

Whitney Point CSD

Aquattica was hired by Whitney Point Central School District to renovate their pool, including upgrading the pool's equipment and making sure the pool was in compliance with all current codes.


Project Features
  • Stainless steel gutter
  • Pool tile depth markers
  • New marcite pool finish
  • Aqua Creek pool lift
  • One meter diving board and stand
  • Aqua-Tab chlorination system
  • UV light system



The project consisted of a complete renovation of the pool, equipment room, and hydraulic engineering.  The pool received a new marcite finish, grab rails with step inserts, and a stainless steel recirculation system.  All of the operational equipment in the mechanical room was replaced and a UV light system was added.


Project Location

24 Keibel Road
Lisle, NY 13862

Google Map




Aquattica News

Aquattica Re-designs Dobbs Ferry Community Pool

This 1.5 million dollar renovation will upgrade the current facility into a state-of-the-art family pool that all ages can enjoy.  It will feature a zero depth entry on one side with water features, a water slide, and a new 9 foot deep end.  A new updated filtration system including new sand filters and chemical controllers will be relocated near the bath house. 


Read More


Aquattica Special Features

Aquattica Special Services and Product Recommendations
Zero Depth Entry
Pool Toy Features
Evacuatorâ„¢
Stainless Steel Gutter
Resistance Walk
UV Light System
Up Stream Jets

Read More