•  
  •  
  •  
  •  
 

Oil City School District

Oil City School District commissioned Aquattica Pools and Water Parks for a pool study and then hired the firm to complete the upgrades recommended in the study for the renovation of their swimming pool.


Project Features
  • New stainless steel gutter system
  • VGB-compliant main drain
  • UV light chloramine destruct system
  • New pool tile



The renovation involved cutting the beam off the pool and installing a new stainless steel gutter system.  New VGB compliant main drains were installed, as well.  The equipment room was gutted and an all-new filtration system was put in place.  Other upgrades included a UV light chloramine destruct system and the repair and replacement of damaged pool tile.


Project Location

Oil City Area School District
825 Grandview Road
Oil City, PA 16301

Google Map




Aquattica News

Aquattica Re-designs Dobbs Ferry Community Pool

This 1.5 million dollar renovation will upgrade the current facility into a state-of-the-art family pool that all ages can enjoy.  It will feature a zero depth entry on one side with water features, a water slide, and a new 9 foot deep end.  A new updated filtration system including new sand filters and chemical controllers will be relocated near the bath house. 


Read More


Aquattica Special Features

Aquattica Special Services and Product Recommendations
Zero Depth Entry
Pool Toy Features
Evacuatorâ„¢
Stainless Steel Gutter
Resistance Walk
UV Light System
Up Stream Jets

Read More